Delta inženjering
  • Delta Inženjering
  • Group Members
  • Capacities
    • Design Sector
    • Engineering Sector
    • Ecological and Water Treatment Sector
  • Corporate Informations
    • Licences, Certificates, IMS certificates
    • Rules of procedure
    • Statistics
    • Auditor’s Report
  • References
    • Oil and Gas
    • Mining and Energetics
    • Mettalurgy and Non-metal Industry
    • Food Processing Industry
    • Environmental Protection
    • Other and Public Facilities
  • Publications
  • Contact
  • SER
  • Delta Inženjering
  • Group Members
  • Capacities
    • Design Sector
    • Engineering Sector
    • Ecological and Water Treatment Sector
  • Corporate Informations
    • Licences, Certificates, IMS certificates
    • Rules of procedure
    • Statistics
    • Auditor’s Report
  • References
    • Oil and Gas
    • Mining and Energetics
    • Mettalurgy and Non-metal Industry
    • Food Processing Industry
    • Environmental Protection
    • Other and Public Facilities
  • Publications
  • Contact
  • SER

Post navigation

Laboratory "Fire Eye" opened in Nis

Posted in home |

05/08/2020

| by natasa vukotic

Delta Inženjering has completed design and construction of a new laboratory for testing coronavirus samples under the name “Fire Eye” in the city of Niš.
The laboratory will perform molecular detection as well as serological diagnostics. The laboratory was built on area of 900 m2 in less than three months.
This laboratory will be able to test 1000 samples a day. This is the second laboratory in Serbia.
The first was also designed and built by Delta Inženjering team in 15 days within the Clinical Center of Serbia.
The laboratory was opened by Prime Minister Ana Brnabic and Minister of Health Zlatibor Loncar.

Post navigation

Completed design and construction of a complete state-of-the-art laboratory (BSL-2) for COVID19 in the Balkans » «
Facility: leachate treatment plant- Vinča landfill

Related Articles

NIS NAFTAGAS – TEHNIČKI SERVISI

NIS AD – DEEP OIL PROCESSING PLANT

Establishment of a new company – Delta Tang

Recent Posts

  • Gas pipeline “Kičevo-Ohrid”
  • Continental Automotive GmbH





  • Center for Genome Sequencing and Bioinformatics





  • The contract on construction and rehabilitation of the Clinical center of Vojvodina in Novi Sad has been signed

  • Facility: leachate treatment plant- Vinča landfill
  • Laboratory "Fire Eye" opened in Nis
  • Completed design and construction of a complete state-of-the-art laboratory (BSL-2) for COVID19 in the Balkans
  • Design and construction of Huo-yan national laboratory for molecular detection of infectious agents
  • Establishment of a new company – Delta Tang
  • Signed first contract of Delta Tang with HBIS GROUP Serbia Iron & Steel

© 2014 Delta Inženjering
web design by Citlik